Projects

1.      Casted the runway of the Abu Obaida Air Base Air force works – Wasit Governorate.

2.      Irrigation and Draining Works (Shamasheer Sheikh Sa’ad) Ministry of Agriculture –(Wasit).

3.      Executed Al- Aziziya Great WTP Project (Wasit Governorate) Local Administration Ministry.

4.      Executed Al Hamzah Al- Kabeer WTP Project (Samawah Governorate) Local Administration Ministry.

5.      Execute Earth Barracks in Wasit Governorate (Sowairah Country)Agriculture & Irrigation Dept.

6.      Executed Al Karamah Tubal Bridge in Wasit Governorate Wasit Sewage and water Dept.

7.      Execute The Banks of the deposit main basins of wasit  water supply Department.
Wasit Sewage and water Dept
.

8.      Executed of soil section of 6 KM long of Al. Nahir Al Kabeer River in Nasiriyah Governorate Wasit Sewage and water Dept.

9.      Three water collecting pools (Hydrau – tanks, EMEK, Prostak)Air force works.

10. Lighting Works of Abu Obaida air Base Irrigation Projects General Authority.

11. Executed three Soil Section with excavating and lining of Basrah R.O water project.
Mabe /ain Al- Nahrain State Co.

12. Executed Yellow Corn Project in Abu GhuraibMabe /ain Al- Nahrain State Co.

13. Paved the yards of Yellow corn project in Abu Ghuraib Middle Aria Works.

14. Executed Karbula’a project (36 bed rooms at own Military camp in Karbula’a.).
Southern Aria work.

15. Executed Basrah project (19 buildings) at the School of sons of the military Force (occupied by British Forcecs) State Company of Industrial Corps.

16. Al – Dhulu’ eeyah Irrigation project Ministry of Irrigation.

17. Executed the work of the body of Al –sad Al Adheem Dam – Civil works.
DIA American CO.

18. After falling the ex-regime, we have executed rehabilitation works of Iraqi media (three buildings) & supplying material food State Co. of Iraqi Ports.

19. It was held a conference with Jicore Group Inc. with state company of Iraqi ports led to signing MOU memorandum G.S.T( Poland organization).

20. Executed close sport hole ( Bejjy power station ).

21. The rehabilitation of unit (2) Bejjy (AL-Masayb power station ).

22. The rehabilitation of unit (2) AL-Masayb (Power supplier + net )( AL-Quadess power station).

23. The erection of AL-Quadess electricity station generation (net works + installation of power supplier for the units (1) & (2)(The general company for transferring electricity ).

24. The installation of circuit breaker  for AL-Daywanyi transferring station 400kva.
( The general company for transferring electricity).

25. 9 fire stations construction  in Baghdad and other governorates & supplying material food with a cost of $3,870,000 Parsons of PCO.

26. Quality control of 60 sites all over Iraq With a cost of $225,000  Parsons of PCO.

27. Ministry of education.   renovation of 3 schools in al Sadr City ) with a cost of $250,000 Ministry of education.

28. Ministry of work and social affairs  (construction of training center in different governorates ) with a cost of $540,000 Ministry of work and social affairs.

29. The installation of circuit breaker for South Baghdad generating  station.

     30.  Development of more than thirty health clinic in Baghdad

     31. Establishment a number of houses in the residential housing compounds in    Baghdad

     32.In cooperation with the Ministry of Oil our company builds a building belonging to the Mechanic Section finished in 2007.

     33.Treatment the Surface of Baghdad Mayoralty Building according to the technical specification.

 

Al-Asriya Group

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E-mail

Design By : Thaaer Q. / AL-Asriya Group 2002

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

info@alasriyagroup.com

tameer@alasriyagroup.com


Contact us
 Industrial
Contractor
Trading
Machines & Equipment
J.V with  HESS Group
Projects
Board of Directors
Vision & Mission
Home
About AL-Asriya